Landscaping supplies schedule of rates template
Landscape yards sell by the cubic metre, the tonne, the square metre and the bag, and the same product can be priced in more than one of them. A schedule of rates fixes the unit each item is billed in, along with the price.
| Row | Item description | Unit | Rate ex GST | GST free (Y/N) |
|---|---|---|---|---|
| 2 | Garden mix soil | m3 | blank | blank |
| 3 | Topsoil, screened | m3 | blank | blank |
| 4 | Turf underlay | m3 | blank | blank |
| 5 | Pine bark mulch | m3 | blank | blank |
| 6 | Hardwood chip mulch | m3 | blank | blank |
| 7 | Decomposed granite | t | blank | blank |
What's in it
- Per cubic metre (m3)
- Garden mix soil
- Topsoil, screened
- Turf underlay
- Pine bark mulch
- Hardwood chip mulch
- Per tonne (t)
- Decomposed granite
- Drainage gravel, 20 mm
- Per bag
- River pebbles 20 mm, 20 kg bag
- Per square metre (m2)
- Couch turf
- Buffalo turf
- Each (EA)
- Treated pine sleeper 200 x 75, 2.4 m
- Concrete sleeper 200 x 75, 2.4 m
- Plants, 140 mm pot
- Plants, 200 mm pot
- Per roll
- Weed mat, 20 m roll
Keep the unit the supplier bills in: CostCode checks the unit on each invoice line against the one agreed. A line billed in a unit that measures something else (per each where you agreed per metre, per tonne where you agreed per cubic metre) is held; one it can't compare, such as per day against per week, is left for a person to confirm, never converted.
Delete the rows you don't buy and add your own under them. Keep the first row as it is: it's how CostCode's importer knows which column is which, so there's nothing to match up by hand when you load it.
Charges landscaping suppliers add on top
- Delivery
- Minimum load or small-order fee
- Pallet deposits
These aren't rows in the file. Agree them with the rates and record each as a charge agreement on the supplier in CostCode, where charge lines are checked against them. Why charges are kept apart
Where these invoices usually go wrong
- Soil or mulch billed per tonne when you agreed per cubic metre
- Turf above the agreed price per square metre
- Turf billed per roll when you agreed per square metre
- Delivery fees above what you agreed
- Minimum-order fees
- A price up on what you've paid before
- One delivery docket on two invoices
What CostCode does about each, with a worked example: Invoice checking for landscapers
Filling it in and loading it
Fill in the items, send the file to the supplier to put in or confirm the rates, and load it into CostCode with the date it applies from.
More templates
- Blank template
- Concrete
- Civil and earthworks
- Electrical supplies
- Plumbing supplies
- Builders' supplies
- Plant and equipment hire
- Structural steel
- Formwork
- Waterproofing supplies
- Roofing supplies
- Painting supplies
- Fit-out and interiors
- Flooring
- Scaffolding hire
- HVAC and mechanical services
- Fire protection supplies
- Glazing supplies
- Demolition and waste
- Delivery docket template
Read more