Plumbing supplies schedule of rates template
Plumbing supplies are bought by the length, the roll and the each, and the same pipe can be priced per metre or per 6 m length. A schedule of rates settles the unit and the price for the items you buy most, so an invoice line can be checked against it.
| Row | Item description | Unit | Rate ex GST | GST free (Y/N) |
|---|---|---|---|---|
| 2 | PVC DWV pipe 100 mm, 6 m length | length | blank | blank |
| 3 | PVC DWV pipe 50 mm, 6 m length | length | blank | blank |
| 4 | PVC DWV bend 100 mm | EA | blank | blank |
| 5 | PVC DWV junction 100 mm | EA | blank | blank |
| 6 | PVC stormwater pipe 90 mm, 6 m length | length | blank | blank |
| 7 | PVC solvent cement 500 mL | EA | blank | blank |
What's in it
- Per length
- PVC DWV pipe 100 mm, 6 m length
- PVC DWV pipe 50 mm, 6 m length
- PVC stormwater pipe 90 mm, 6 m length
- Copper tube 15 mm, type B, 6 m length
- Each (EA)
- PVC DWV bend 100 mm
- PVC DWV junction 100 mm
- PVC solvent cement 500 mL
- PVC priming fluid 500 mL
- Ball valve 15 mm
- Floor waste grate 100 mm
- Electric hot water unit, 250 L
- Per roll
- PEX pipe 16 mm, 50 m roll
Keep the unit the supplier bills in: CostCode checks the unit on each invoice line against the one agreed. A line billed in a unit that measures something else (per each where you agreed per metre, per tonne where you agreed per cubic metre) is held; one it can't compare, such as per day against per week, is left for a person to confirm, never converted.
Delete the rows you don't buy and add your own under them. Keep the first row as it is: it's how CostCode's importer knows which column is which, so there's nothing to match up by hand when you load it.
Charges plumbing suppliers add on top
- Delivery
- Small-order fee
- Pallet deposits
These aren't rows in the file. Agree them with the rates and record each as a charge agreement on the supplier in CostCode, where charge lines are checked against them. Why charges are kept apart
Where these invoices usually go wrong
- Your trade discount not applied
- Pipe billed per length when you agreed per metre
- Fittings by the box against a price each
- A hot water unit above the agreed price
- Freight and delivery fees
- The same invoice sent twice
- A discount taken off the whole invoice
What CostCode does about each, with a worked example: Invoice checking for plumbers
Filling it in and loading it
Fill in the items, send the file to the supplier to put in or confirm the rates, and load it into CostCode with the date it applies from.
More templates
- Blank template
- Concrete
- Civil and earthworks
- Electrical supplies
- Builders' supplies
- Landscaping supplies
- Plant and equipment hire
- Structural steel
- Formwork
- Waterproofing supplies
- Roofing supplies
- Painting supplies
- Fit-out and interiors
- Flooring
- Scaffolding hire
- HVAC and mechanical services
- Fire protection supplies
- Glazing supplies
- Demolition and waste
- Delivery docket template
Read more
Got a supplier invoice handy? Check it now.
About ten seconds. No account. We don't keep the file.