Builders' supplies schedule of rates template
A builder buys hundreds of different items from the timber and hardware yard. Start the schedule with the ones on every job: framing timber, sheet goods, fixings, bins and site hire. Rows can be added any time.
| Row | Item description | Unit | Rate ex GST | GST free (Y/N) |
|---|---|---|---|---|
| 2 | Framing pine 90 x 45 MGP10 | m | blank | blank |
| 3 | Framing pine 90 x 35 MGP10 | m | blank | blank |
| 4 | Framing pine 70 x 35 MGP10 | m | blank | blank |
| 5 | LVL beam 240 x 45 | m | blank | blank |
| 6 | Structural plywood 17 mm, 2400 x 1200 | sheet | blank | blank |
| 7 | Plasterboard 10 mm, 2400 x 1200 | sheet | blank | blank |
What's in it
- Per metre (m)
- Framing pine 90 x 45 MGP10
- Framing pine 90 x 35 MGP10
- Framing pine 70 x 35 MGP10
- LVL beam 240 x 45
- Per sheet
- Structural plywood 17 mm, 2400 x 1200
- Plasterboard 10 mm, 2400 x 1200
- Each (EA)
- Construction adhesive, 375 g
- Joist hanger, 45 mm
- Skip bin 4 m3, general waste
- Skip bin 6 m3, general waste
- Per box
- Framing nails 75 x 3.05 mm, 5 kg box
- Batten screws 14g x 75 mm, box of 100
- Per week
- Temporary fence panel
- Portable toilet, serviced
- Site shed 6 x 3 m
Keep the unit the supplier bills in: CostCode checks the unit on each invoice line against the one agreed. A line billed in a unit that measures something else (per each where you agreed per metre, per tonne where you agreed per cubic metre) is held; one it can't compare, such as per day against per week, is left for a person to confirm, never converted.
Delete the rows you don't buy and add your own under them. Keep the first row as it is: it's how CostCode's importer knows which column is which, so there's nothing to match up by hand when you load it.
Charges builders suppliers add on top
- Delivery
- Small-order fee
- Pallet deposits
- Fuel levy
These aren't rows in the file. Agree them with the rates and record each as a charge agreement on the supplier in CostCode, where charge lines are checked against them. Why charges are kept apart
Where these invoices usually go wrong
- Framing timber above the agreed price per metre
- Timber billed per length when you agreed per lineal metre
- Frames and trusses above the quote for the job
- Hire billed above the agreed rate
- Skip bins and delivery charges
- An invoice addressed to the wrong one of your companies
- More billed than you ordered
- Hire kept on after it went back
What CostCode does about each, with a worked example: Invoice checking for builders
Filling it in and loading it
Frames and trusses are usually priced per job from the plans rather than per unit. Load that quote against the job it's for: CostCode's importer takes a supplier's quote and the job it applies to, and checks that job's invoices against it until the quote's date.
Fill in the items, send the file to the supplier to put in or confirm the rates, and load it into CostCode with the date it applies from.
More templates
- Blank template
- Concrete
- Civil and earthworks
- Electrical supplies
- Plumbing supplies
- Landscaping supplies
- Plant and equipment hire
- Structural steel
- Formwork
- Waterproofing supplies
- Roofing supplies
- Painting supplies
- Fit-out and interiors
- Flooring
- Scaffolding hire
- HVAC and mechanical services
- Fire protection supplies
- Glazing supplies
- Demolition and waste
- Delivery docket template
Read more
Got a supplier invoice handy? Check it now.
About ten seconds. No account. We don't keep the file.
Or start free: 20 invoices a month, no card