Civil and earthworks schedule of rates template
Civil work buys by the tonne and by the hour: quarry products from the pit, trucks and plant by the hour, and tipping by the tonne at the other end. Each comes with its own unit, and a schedule of rates is where the unit gets agreed along with the price.
| Row | Item description | Unit | Rate ex GST | GST free (Y/N) |
|---|---|---|---|---|
| 2 | Road base, 20 mm | t | blank | blank |
| 3 | Aggregate, 20 mm | t | blank | blank |
| 4 | Aggregate, 10 mm | t | blank | blank |
| 5 | Crusher dust | t | blank | blank |
| 6 | Recycled crushed concrete, 20 mm | t | blank | blank |
| 7 | Fill sand | t | blank | blank |
What's in it
- Per tonne (t)
- Road base, 20 mm
- Aggregate, 20 mm
- Aggregate, 10 mm
- Crusher dust
- Recycled crushed concrete, 20 mm
- Fill sand
- Tipping fee, clean fill
- Tipping fee, mixed construction waste
- Tipping fee, concrete and brick
- Per hour
- Tipper truck, wet hire
- Truck and dog, wet hire
- Excavator 5 t, wet hire
- Excavator 20 t, wet hire
- Skid steer loader, wet hire
- Smooth drum roller, wet hire
- Water cart, wet hire
- Each (EA)
- Float, each way
Keep the unit the supplier bills in: CostCode checks the unit on each invoice line against the one agreed. A line billed in a unit that measures something else (per each where you agreed per metre, per tonne where you agreed per cubic metre) is held; one it can't compare, such as per day against per week, is left for a person to confirm, never converted.
Delete the rows you don't buy and add your own under them. Keep the first row as it is: it's how CostCode's importer knows which column is which, so there's nothing to match up by hand when you load it.
Charges civil and earthworks suppliers add on top
- Cartage priced per tonne or per load, rather than by the truck hour
- Waiting time
- Fuel levy
- Environmental levy
These aren't rows in the file. Agree them with the rates and record each as a charge agreement on the supplier in CostCode, where charge lines are checked against them. Why charges are kept apart
Where these invoices usually go wrong
- Billed per cubic metre when you agreed per tonne, or the reverse
- Quarry products above the agreed rate
- Cartage and fuel levies above what you agreed
- Tipping fees and levies
- Plant hire above the agreed rate
- One delivery docket on two invoices
- More tonnes billed than you ordered
- Hours billed against your plant dockets
What CostCode does about each, with a worked example: Invoice checking for civil and earthworks contractors
Filling it in and loading it
Wet hire includes the operator and dry hire doesn't, and the two rates for the same machine are far apart. Say which in each row.
Fill in the items, send the file to the supplier to put in or confirm the rates, and load it into CostCode with the date it applies from.
More templates
- Blank template
- Concrete
- Electrical supplies
- Plumbing supplies
- Builders' supplies
- Landscaping supplies
- Plant and equipment hire
- Structural steel
- Formwork
- Waterproofing supplies
- Roofing supplies
- Painting supplies
- Fit-out and interiors
- Flooring
- Scaffolding hire
- HVAC and mechanical services
- Fire protection supplies
- Glazing supplies
- Demolition and waste
- Delivery docket template
Read more