Plant and equipment hire schedule of rates template
Hire is priced by the hour, the day or the week, often with a minimum hire, a float to get the machine to site, and refuelling when it comes back. A schedule of rates pins down the period each item is hired by, and the price, before the first docket.
| Row | Item description | Unit | Rate ex GST | GST free (Y/N) |
|---|---|---|---|---|
| 2 | Mini excavator 1.7 t, dry hire | day | blank | blank |
| 3 | Excavator 5 t, dry hire | day | blank | blank |
| 4 | Skid steer loader, dry hire | day | blank | blank |
| 5 | Plate compactor | day | blank | blank |
| 6 | Trench roller | day | blank | blank |
| 7 | Scissor lift, 19 ft electric | day | blank | blank |
What's in it
- Per day
- Mini excavator 1.7 t, dry hire
- Excavator 5 t, dry hire
- Skid steer loader, dry hire
- Plate compactor
- Trench roller
- Scissor lift, 19 ft electric
- Knuckle boom lift, 45 ft
- Generator 6 kVA
- Jackhammer
- Concrete mixer
- Per week
- Temporary fence panel
- Portable toilet, serviced
- Site shed 6 x 3 m
- Each (EA)
- Float, each way
- Minimum hire charge
- Per litre (L)
- Refuelling, diesel
Keep the unit the supplier bills in: CostCode checks the unit on each invoice line against the one agreed. A line billed in a unit that measures something else (per each where you agreed per metre, per tonne where you agreed per cubic metre) is held; one it can't compare, such as per day against per week, is left for a person to confirm, never converted.
Delete the rows you don't buy and add your own under them. Keep the first row as it is: it's how CostCode's importer knows which column is which, so there's nothing to match up by hand when you load it.
Charges plant and equipment hire suppliers add on top
- Delivery or pick-up, when it's billed as delivery rather than a float
- Fuel levy
- Environmental levy
These aren't rows in the file. Agree them with the rates and record each as a charge agreement on the supplier in CostCode, where charge lines are checked against them. Why charges are kept apart
Filling it in and loading it
One row per item and period. A day rate and a week rate for the same machine under the same description can't be told apart on an invoice line, so CostCode leaves those lines unverified rather than guess. Put in the rate you're billed on.
Damage waiver charged as a percentage of the hire isn't a price per unit, so it can't go in this file as a rate.
Fill in the items, send the file to the supplier to put in or confirm the rates, and load it into CostCode with the date it applies from.
More templates
- Blank template
- Concrete
- Civil and earthworks
- Electrical supplies
- Plumbing supplies
- Builders' supplies
- Landscaping supplies
- Structural steel
- Formwork
- Waterproofing supplies
- Roofing supplies
- Painting supplies
- Fit-out and interiors
- Flooring
- Scaffolding hire
- HVAC and mechanical services
- Fire protection supplies
- Glazing supplies
- Demolition and waste
- Delivery docket template
Read more
Got a supplier invoice handy? Check it now.
About ten seconds. No account. We don't keep the file.
Or start free: 20 invoices a month, no card