Concrete schedule of rates template
Premixed concrete is priced per cubic metre by strength grade and aggregate size, with extras on top: additives, pumping, and a fee when a load is small. A schedule of rates puts each of those in writing before the first pour, so the docket and the invoice have something to be checked against.
| Row | Item description | Unit | Rate ex GST | GST free (Y/N) |
|---|---|---|---|---|
| 2 | N20 concrete, 20 mm aggregate | m3 | blank | blank |
| 3 | N25 concrete, 20 mm aggregate | m3 | blank | blank |
| 4 | N32 concrete, 20 mm aggregate | m3 | blank | blank |
| 5 | N40 concrete, 20 mm aggregate | m3 | blank | blank |
| 6 | N25 concrete, 14 mm aggregate | m3 | blank | blank |
| 7 | Set accelerator | m3 | blank | blank |
What's in it
- Per cubic metre (m3)
- N20 concrete, 20 mm aggregate
- N25 concrete, 20 mm aggregate
- N32 concrete, 20 mm aggregate
- N40 concrete, 20 mm aggregate
- N25 concrete, 14 mm aggregate
- Set accelerator
- Set retarder
- Synthetic fibres
- Per load
- Short load fee
- Per hour
- Boom pump hire
- Line pump hire
Keep the unit the supplier bills in: CostCode checks the unit on each invoice line against the one agreed. A line billed in a unit that measures something else (per each where you agreed per metre, per tonne where you agreed per cubic metre) is held; one it can't compare, such as per day against per week, is left for a person to confirm, never converted.
Delete the rows you don't buy and add your own under them. Keep the first row as it is: it's how CostCode's importer knows which column is which, so there's nothing to match up by hand when you load it.
Charges concrete suppliers add on top
- Cartage or delivery, when it's billed apart from the concrete
- Waiting time on site
- Fuel levy
- Environmental levy
These aren't rows in the file. Agree them with the rates and record each as a charge agreement on the supplier in CostCode, where charge lines are checked against them. Why charges are kept apart
Where these invoices usually go wrong
- The mix billed above your agreed price
- A price rise billed before it starts
- Waiting time, cartage and minimum-load charges above what you agreed
- Short-load, after-hours and additive charges
- One delivery docket on two invoices
- Reo billed per kilo against a price per tonne
- Pump hours billed against a day rate
What CostCode does about each, with a worked example: Invoice checking for concrete contractors
Filling it in and loading it
Agree what counts as a short load (the volume below which the fee applies) at the same time as the fee, and keep it with the schedule.
Fill in the items, send the file to the supplier to put in or confirm the rates, and load it into CostCode with the date it applies from.
More templates
- Blank template
- Civil and earthworks
- Electrical supplies
- Plumbing supplies
- Builders' supplies
- Landscaping supplies
- Plant and equipment hire
- Structural steel
- Formwork
- Waterproofing supplies
- Roofing supplies
- Painting supplies
- Fit-out and interiors
- Flooring
- Scaffolding hire
- HVAC and mechanical services
- Fire protection supplies
- Glazing supplies
- Demolition and waste
- Delivery docket template
Read more
Got a supplier invoice handy? Check it now.
About ten seconds. No account. We don't keep the file.
Or start free: 20 invoices a month, no card