Checking concrete supplier invoices

A premix invoice is a few lines per pour: the concrete by the cubic metre, and the extras around it.

Check my invoice

Free · No account · We don't keep the file

Who you buy from, and how it's billed

The mix is the easy part to check. The extras are harder, because each is priced its own way, and a price rise billed before its start date looks exactly like the right price.

Premix suppliers
Concrete by the cubic metre, priced by strength and mix (N20, N25, N32 and so on), with extra for additives, colour or a different slump.
The extras on a premix invoice
Waiting time past the allowance in your terms, short-load fees for a part load, after-hours and weekend deliveries, and cartage.
Concrete pumping
By the hour, per cubic metre pumped, or both, with set-up and travel charges.
Reinforcement
Bar by the tonne or the length, mesh by the sheet, and chairs, tie wire and accessories by the bag or each.
Formwork and hire
Formply by the sheet, and screeds, vibrators and other gear by the day or week.

What CostCode checks, and from when

Anything it can't check yet shows as Unverified, with the reason. It's never marked as fine. Why a line is unverified

  1. From your first invoice

    The same invoice twice, GST over ten per cent, or no ABN on a tax invoice.

    • One delivery docket on two invoices

      Checked, for you only
      Where the docket number is printed on the line, a docket already billed on an earlier invoice from the same supplier holds the invoice for you to look at. It's never put to the supplier: a credit and a re-issue carry the same docket too.
  2. Once a supplier has billed you a few times

    A price up on what you've paid before, once there are three earlier prices. Kept between you and CostCode.

  3. Once your prices are in

    Import each supplier's price list from a spreadsheet or a PDF, or let CostCode suggest one from invoices you've already uploaded, for you to confirm.

    • The mix billed above your agreed price

      Checked
      Each line is checked against the price list in force on the invoice date, and held when it's at least $25 and 3% over. Both floors are yours to change in Settings.
    • A price rise billed before it starts

      Checked
      Load the supplier's new price list with the date it starts. An invoice dated before then is still checked against the old prices, so the new ones can't arrive early.
    • Waiting time, cartage and minimum-load charges above what you agreed

      Checked
      Checked against the charge you agreed: a flat amount, a share of the goods, or a rate per minute or hour. With no agreed charge on file, the line shows as Unverified, with the reason.
    • Short-load, after-hours and additive charges

      Checked
      Checked when you've recorded an agreed price for them. Without one, the line shows as Unverified, with the reason, and never as fine.
    • Reo billed per kilo against a price per tonne

      Asks you first
      CostCode doesn't turn one unit into another, even kilos into tonnes: the line shows as Unverified, asking how many of one make the other. Mesh billed per sheet against a price each is compared on price, and anything over is kept for you until you confirm it's the same item.
    • Pump hours billed against a day rate

      Asks you first
      Hours and days are both time, and CostCode won't guess how many hours your day rate covers, so the line shows as Unverified with the question. Billed by the hour against an hourly rate, it's checked.

A worked example, made up

With your pricesSample · made up

Sample Premix Concrete (made up)

SAMPLE-3107

Held

29 Jul 2026 · 1 line · $2,147.20

$96.00

over what you agreed (5.17%)

The line on sample invoice SAMPLE-3107, checked against the agreed price list
ItemAmountYour prices
N32 20mm premix concrete6.4 M3 × $305.00$1,952.00Above the agreed rate$96.00 over
Above the agreed rate. Agreed $290.00 per m³ on the price list from 1 Jan 2026
Not sent: supplier email is off. CostCode writes the query, quoting the agreed price list, for you to copy into your own email. Nothing reaches the supplier unless someone in your team sends it.

6.4 m³ at $305.00 against an agreed $290.00 per m³ is $96.00 over (5.17%). That's at least $25 and 3%, the default floors, so the invoice is held.

The supplier's new price list, at $305.00 per m³, starts on 1 Aug 2026. This invoice is dated 29 Jul 2026.

Without the start date, the new price would look right. With it, the invoice is checked against the price that applied on the day it was raised.

Made up: the supplier, the invoice and every price in this example are invented to show the arithmetic. They aren't market prices.

Concrete schedule of rates templateGrades per cubic metre, pump hire

What CostCode doesn't check

  • The cubic metres billed against what arrived on site: CostCode doesn't read your delivery dockets or measure the pour.
  • Whether the mix billed is the mix you ordered, or your test results.

Questions

Can CostCode check a concrete invoice against our supplier's price list?

Yes, once the price list is in: load it from a spreadsheet or a PDF, or let CostCode suggest one from invoices you've already paid, for you to tick. Each line is then checked against the prices in force on the invoice date. A price built from your invoices is checked against, but never quoted to the supplier until they've confirmed it.

What happens when the supplier puts their prices up?

Load the new price list with the date it starts. Invoices dated before then are checked against the old list, and invoices dated from then against the new one.

Does CostCode check the cubic metres we were charged for?

Not against what arrived on site: it doesn't read delivery dockets. It checks the price of what's billed, and holds an invoice for you when a docket number printed on it was already billed on an earlier invoice from the same supplier.